Servicing
DMC PMT Cooler and Reaction Chamber Replacement
Thermo Scientific
42iQLS Instruction Manual
7-33
Figure 7–35.
Photo Reaction Chamber Cleaning, Hardware
6.
Pull reaction chamber outwards.
Equipment Damage
Some internal components can be damaged by small
amounts of static electricity. A properly grounded antistatic wrist strap
must be worn while handling an internal component.
▲
7.
To reinstall reaction chamber, follow previous steps in reverse, making
sure to back fill the cooler with dry air or nitrogen prior to installing
reaction chamber.
8.
Reinstall the measurement bench. Refer to
Figure 7–34
and
Figure 7–
41
.
Содержание 42iQLS
Страница 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Страница 192: ......
Страница 199: ...Maintenance Pump Rebuilding Thermo Scientific 42iQLS Instruction Manual 5 7 Figure 5 3 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQLS Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 230: ...Servicing Power Supply Replacement 7 24 42iQLS Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 254: ...Servicing DMC Ozonator 7 48 42iQLS Instruction Manual Thermo Scientific Figure 7 50 Remove Ammonia Scrubber ...
Страница 296: ......
Страница 304: ......
Страница 316: ......
Страница 317: ......