Optional Equipment
Internal Permeation Span Source
9-22
42iQ Instruction Manual
Thermo Scientific
Use the following procedure to install the permeation tube.
CAUTION
Allow oven to cool down prior to servicing.
▲
1.
Lift oven cover up.
2.
Lift and unlatch two oven cover handles.
Figure 9–12.
Installing Glass Tube pt 1
3.
Unfasten nut. Loosen thumb screw 2X full counter clock rotation.
4.
Loosening the thumb screw deflates the o-ring making it easier to pull
the thermistor assembly out.
Permeation Tube
Installation
Содержание 42iQ
Страница 1: ...42iQ Instruction Manual NO NO2 NOx Analyzer 117435 00 1Apr2020 ...
Страница 2: ......
Страница 18: ......
Страница 34: ...Operation Instrument Display 3 8 42iQ Instruction Manual Thermo Scientific ...
Страница 164: ......
Страница 192: ......
Страница 199: ...Maintenance Pump Rebuilding Thermo Scientific 42iQ Instruction Manual 5 7 Figure 5 3 Pump Rebuilding ...
Страница 214: ...Servicing Fan Replacement 7 8 42iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 256: ...Servicing DMC Ozonator 7 50 42iQ Instruction Manual Thermo Scientific Figure 7 53 Remove Ammonia Scrubber ...
Страница 306: ......
Страница 318: ......
Страница 319: ......