29
Evaporator/Control Box Installation (continued)
NOTE: It is not necessary to remove the Evaporator/Control Box cover to complete a system installation.
NOTE: This installation requires a two-person or mechanically assisted lift.
1.
Position template with
RETURN AIR
flush with bulkhead. Mark location of the 7/8” evaporator drain holes
and 2” access holes. Remove the template:
a.
Drill a 1/4” pilot hole for drain holes followed by a 7/8” step reamer.
b.
Drill the 2” access holes. The holes may also be located outside the template area as shown.
2.
Cut and install a piece of split loom (or similar) around the inside edge of the 2” access holes to provide
protection for hoses and wiring.
3.
Install return air filter support to front of Evaporator/Control Box.
4.
Set evaporator in place and determine where return air opening needs to be located on bulkhead. Leave
clearance for filter removal.
5.
Mark return air opening (11.00 in. x 10.00 in.).
a.
Cut opening in bulkhead.
b.
A return air grille (installer supplied) can be installed to the bulkhead if desired.
6.
Install the defrost drain tubes to the base of the evaporator before mounting to the floor.
7.
Loosely install the three mounting tabs onto the evaporator
.
8.
Secure the evaporator to the floor with TEK screws.
9.
Tighten the mounting tab bolts.
10.
From underneath the sleeper:
a.
Seal around drain tube access holes with sealing putty or silicone sealant.
b.
Apply silicone sealant around the three evaporator mounting screws.
c.
Seal any unused holes, cracks, or visible air gaps that might be found.
Figure 14: Preferred Location Shown - Flush with Front Bulkhead
Содержание TriPac Envidia
Страница 2: ......
Страница 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Страница 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Страница 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Страница 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Страница 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Страница 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Страница 17: ...15 AC DC Shore Power Converter Dimensions Option Figure 7 AC DC Shore Power Converter Dimensions...
Страница 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Страница 19: ...17 BLANK PAGE...
Страница 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Страница 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......