71
Step 2 – Procedures (continued)
17.
From the drop down menu select 1A then click Run Test.
18.
Select System Monitoring tab.
19.
Select SCM/Batteries at the top of the screen.
20.
Locate the data group associated with selected battery (example: 1A = SCM1 Battery A).
a.
Note the value of Requested Mode. It should indicate DISCHARGING.
b.
Note the value of Stage of Operation. It should be GOOD.
c.
All others should be NULL.
21.
At the HMI, rotate the Fan Speed Selection knob to highest speed setting.
a.
Note the Aux Battery Current for the selected battery.
b.
Should indicate minus 2 or more amps.
22.
In the Service Test screen, click Cancel Test.
23.
Repeat the Battery Discharge Test for each remaining battery (1B, 2A and 2B).
24.
At the HMI, rotate the Fan Speed Selection knob to OFF.
Battery Charge
25.
Connect battery charger or Shore Power Converter (if applicable).
26.
Turn the truck ignition switch to the ON position. Note: Truck engine not required to run. There is a 3-minute delay
before entering Charge Mode.
27.
Select Service Test tab.
28.
In the Service Test screen select Battery Charge Test.
29.
From the drop down menu select 1A then click Run Test.
30.
Select System Monitoring tab.
31.
Select SCM/Batteries at the top of screen.
32.
Locate the data group associated with selected battery (example: 1A = SCM1 Battery A).
c.
Note the value of Requested Mode. It should indicate CHARGING.
d.
Note the value of Stage of Operation. It should not be NULL.
e.
All others should be Null.
33.
Note the value of Aux Battery Current after one minute.
a.
Aux Battery Current should indicate positive amps.
34.
Select Service Test tab.
35.
In the Service Test Screen select Cancel Test.
36.
Repeat test for each remaining battery (1B, 2A and 2B).
37.
Turn truck ignition OFF.
38.
Disconnect battery charger or Shore Power Converter (if applicable).
Содержание TriPac Envidia
Страница 2: ......
Страница 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Страница 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Страница 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Страница 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Страница 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Страница 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Страница 17: ...15 AC DC Shore Power Converter Dimensions Option Figure 7 AC DC Shore Power Converter Dimensions...
Страница 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Страница 19: ...17 BLANK PAGE...
Страница 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Страница 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......