Tips for a Successful Installation
BEFORE BEGINNING THE INSTALLATION
•
Read this manual to understand where components are to be located and how they are to be installed.
•
Review component location diagram and discuss with the customer where each component will be installed on his
tractor.
•
Verify tools and special equipment required for the installation are available and in good working condition.
•
Open all installation kits and inspect the contents before beginning installation.
•
It is recommended that one person performs the installation of all the components
outside
the sleeper while a
second person installs all the components
inside
the sleeper. This will help minimize any damage to the sleeper’s
interior from grease, dirt, etc.
TRACTOR ALTERNATOR
•
Tractor’s engine must be fitted with an upgraded alternator of 270 amps or more and with upgraded alternator wiring of
OEM approved design.
TRACTOR’S BATTERIES
•
It is important not to allow the tractor’s batteries to become discharged during the installation process. A battery
charger should be connected to the batteries while the installation is in process or shut the tractor’s battery power
supply completely off using the OEM main battery disconnect switch, if available. See Tractor and APU Battery
Recommendations section in this manual for more information.
APU BATTERIES
•
Thermo King NXT AGM batteries are shipped fully charged and ready to use. See Tractor and APU Battery
Recommendations section in this manual for more information..
APU BATTERY BOX INSTALLATION
•
IMPORTANT: DO NOT weld or drill holes in the top or bottom flanges of the tractor’s frame. Serious structural
damage could occur to the frame! Consult your chassis manufacturer for further information.
•
The battery box is designed to be mounted
only
to the existing truck frame rails.
NO OTHER MOUNTING
LOCATION IS ACCEPTABLE!
•
Safely relocate components on the chassis that interfere with the installation of the battery box.
•
Check clearance around battery box before beginning the installation.
•
The use of a motorcycle/ATV lift or modified floor jack to raise battery box into position is recommended.
•
Only the supplied spacer blocks and mounting claws must be used to install the battery box to the chassis frame rail.
•
If different mounting bolts are used, they must be Grade 5 and of the correct length.
DO NOT
cut off excessive length
bolts.
•
Verify the upper and lower battery box mounting bolts are square and flat with the chassis frame rail before
tightening.
•
The mounting hardware securing the battery box to the tractor’s frame must be correctly positioned and torqued
using the four-step tightening sequence described in this manual.
Содержание TriPac Envidia
Страница 2: ......
Страница 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Страница 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Страница 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Страница 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Страница 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Страница 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Страница 17: ...15 AC DC Shore Power Converter Dimensions Option Figure 7 AC DC Shore Power Converter Dimensions...
Страница 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Страница 19: ...17 BLANK PAGE...
Страница 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Страница 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......