67
Operation Checkout Procedures
Overview
An operation checkout procedure must be performed after the TriPac Envidia
installation has been completed. This procedure
will confirm the operation of the heating and air conditioning systems, and will verify the TriPac Envidia
batteries are
charging and discharging properly. Any alarm codes that may have been set can also be checked and cleared. This checkout
procedure will be done in two steps:
Step 1 -
Use the TriPac Envidia
HMI controller to verify basic system operation.
Step 2 -
Use a laptop PC connected directly to the TriPac Envidia
Base Controller module using
the Envidia Service
Tool
and
Service Test Mode
to verify system operation in more detail.
The Envidia Service Tool communication software is service computer
and will export information directly to a laptop PC.
This software provides the technician with system interface, flash load system upgrades, real time system information
retrieval, Service Test Mode and Alarm clearing capabilities.
The following tools will be required:
•
Laptop Computer (IBM Compatible).
•
USB Adapter Harness (204-2000 or USB Mini-B).
•
Envidia Service Tool software.
Step 1 – Checkout Procedures Using the HMI Controller
The following operation checkout procedures will be performed using the TriPac Envidia
HMI controller.
NOTE: Make sure the tractor’s engine is off and ignition switch is in the off position.
1.
Rotate Mode Selection knob to
Fan Mode
.
2.
Rotate Temperature Selection knob so white dot is at the top.
3.
Press Mode Selection knob for at least one second to turn the TriPac Envidia
system ON.
a.
Fan icon should flash for several seconds then stay on.
b.
Evaporator fan may not start.
c.
Battery level bars should illuminate steady green. It may take up to 30 seconds for the battery level bars to
illuminate steady green.
4.
Rotate Fan Speed Selection knob
clockwise
.
NOTE: There will be a two second delay in response to changes made using the HMI Controller.
a.
Fan speed LED indicators should increase.
b.
Evaporator fan speed should increase.
5.
Rotate Fan Speed Selection knob
counterclockwise.
a.
Fan speed LED indicators should decrease.
b.
Evaporator fan speed should decrease.
6.
Rotate Temperature Selection knob
counterclockwise
to the blue stop.
Содержание TriPac Envidia
Страница 2: ......
Страница 11: ...9 Battery Box Dimensions Figure 1 Battery Box Dimensions...
Страница 12: ...10 Battery Box Dimensions continued Figure 2 Battery Box Dimensions continued...
Страница 13: ...11 Evaporator Control Box Dimensions Figure 3 Evaporator Control Box Dimensions...
Страница 14: ...12 Condenser with Receiver Drier Dimensions Figure 4 Condenser with Receiver Drier Dimensions...
Страница 15: ...13 HMI Dimensions Figure 5 HMI Dimensions...
Страница 16: ...14 1000 Watt Power Inverter Dimensions Option Figure 6 1000 Watt Power Inverter Dimensions...
Страница 17: ...15 AC DC Shore Power Converter Dimensions Option Figure 7 AC DC Shore Power Converter Dimensions...
Страница 18: ...16 D2 D4 Heater Dimensions Option Figure 8 Heater Dimension...
Страница 19: ...17 BLANK PAGE...
Страница 21: ...19 Typical Component Locations Figure 9 Typical Component Locations...
Страница 45: ...43 A C Duct Installation continued FLUSH MOUNTED EVAPORATOR Figure 21 A C Duct locations...
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......