INSTALLATION
3-18
Manual 0-5057
PAK 200
NOTE
Depending on the length of the torch leads, the system may require more coolant after turning the
system ON for the first time.
a. Place the ON/OFF Switch to ON.
b. After about 30 seconds the system may shut down if the leads are not full of coolant.
c. Place the ON/OFF switch to OFF.
d. After 10 seconds place the ON/OFF switch to ON again.
e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of
the torch leads this sequence may need to be done three to five times.
f. After the system stays operational allow the pump to operate for ten minutes to properly purge
any air from the coolant lines before using the system.
4. Re-fill the reservoir and re-install the filler cap.
5. Purge coolant from the torch before firing the torch. Ensure there are no leaks before use. If
leaks are evident, consult the coolant leak trouble-shooting guide in the maintenance section of this
manual.
Содержание PAK 200
Страница 4: ...This page intentionally blank ...
Страница 8: ...TABLE OF CONTENTS ...
Страница 16: ...PAK 200 GENERAL INFORMATION 1 8 Manual 0 5057 This Page Intentionally Blank ...
Страница 24: ...SPECIFICATIONS 2 8 Manual 0 5057 PAK 200 This page is blank intentionally ...
Страница 55: ...PAK 200 Manual 0 5057 4 13 OP This Page Intentionally Blank ...
Страница 56: ...PAK 200 OPERATION 4 14 Manual This Page Intentionally Blank ...
Страница 82: ...PARTS LIST 6 22 Manual 0 5057 PAK 200 This Page Intentionally Blank ...
Страница 92: ...This Page Intentionally Blank ...