Manual 0-5057
3-13
INSTALLATION
PAK 200
3.10 Connect Torch Leads to the Gas Control Module / Arc Starter
1. Remove the top cover from the Gas Control Module / Arc Starter.
2. Pass the torch leads and coolant leads through the torch leads port on the back of the module. Ensure that the
leads outer jacket slides into the port.
CAUTION
Use protective gloves when handling the leads. Do not kink or bend the leads.
3. Connect the leads to the module in the sequence shown. Coolant leads and connectors are color-tagged; red
for coolant return, green for coolant supply. Shield gas and plasma gas connections are left- and right- hand
threaded and will not interchange.
Torch Leads: Coolant Supply & Return
Plasma Gas
Shield Gas
Art #: A-008382
Содержание PAK 200
Страница 4: ...This page intentionally blank ...
Страница 8: ...TABLE OF CONTENTS ...
Страница 16: ...PAK 200 GENERAL INFORMATION 1 8 Manual 0 5057 This Page Intentionally Blank ...
Страница 24: ...SPECIFICATIONS 2 8 Manual 0 5057 PAK 200 This page is blank intentionally ...
Страница 55: ...PAK 200 Manual 0 5057 4 13 OP This Page Intentionally Blank ...
Страница 56: ...PAK 200 OPERATION 4 14 Manual This Page Intentionally Blank ...
Страница 82: ...PARTS LIST 6 22 Manual 0 5057 PAK 200 This Page Intentionally Blank ...
Страница 92: ...This Page Intentionally Blank ...