
Maintenance Model
2120XL
Teledyne Analytical Instruments
66
Table 5-1 summarizes the recommended routine maintenance
required for the Model 2120XL.
Table 5-1: Routine Maintenance Schedule
Maintenance Task
Time Schedule
Calibrate Every
1-2
weeks
Check sample gas flow rate
Every 1-2 weeks
Check for excessive accumulation of dirt
Weekly
Check gas lines for leaks
Yearly
5.3 Fuse Replacement
1.
Place small screwdriver in notch, and pry cover off, as shown
in Figure 5-1.
Figure 5-1: Removing Fuse Block from Housing
2.
To change between American and European fuses, remove
the single retaining screw, flip Fuse Block over 180 degrees,
and replace screw.
3.
Replace fuse as shown in Figure 5-2.
4.
Reassemble Housing as shown in Figure 5-1.
Содержание 2120XL
Страница 12: ...Model 2120XL Teledyne Analytical Instruments xii ...
Страница 28: ...Operational Theory Model 2120XL Teledyne Analytical Instruments 16 ...
Страница 46: ...Installation Model 2120XL Teledyne Analytical Instruments 34 ...
Страница 76: ...Operation Model 2120XL Teledyne Analytical Instruments 64 ...
Страница 82: ...Maintenance Model 2120XL Teledyne Analytical Instruments 70 ...