46
52
131
152
182
52
183
130
33
BAG D (Continued)
17
Step D-3
Step D-4
q
1. Insert a 4-40 x 3/4" Cap Head Screw (130) on either side of the
Shock Tower (52) through the middle hole on the top of the Shock
Tower. Secure the Screws to the Tower by threading a 4-40 Zinc Nut
(182) over each Screw and tightening.
q
2. Thread a 3/8" Short Neck Ball Stud (33) through the inner and
upper-most of the lower five holes on either side of the Shock Tower,
and secure it with a 4-40 Mini Nut (183).
The Ball Studs should pass through the Tower from the same
direction as the Cap Head Screws.
182
There is a short Thread-Cutting Screw included in the Wrench
bag. This Screw can be used to tap threads in the holes in the Main
Chassis. Pre-tapping these holes makes it easier to install the Screws
during assembly.
q
1. Slide a .250 x .020 Washer (152) over four 4-40 x 3/8" Cap Head
Screws (131).
q
2. Attach the Front Shock Tower (52) to the front of the Chassis
(46) with the four Screws. The Screws thread into the top-most and
bottom-most holes, surrounding the posts, which stick out of the
front of the Chassis. The Shock Tower should interlock with the posts
on the Chassis.
Front Shock Tower
Front Shock Tower Install
130
Figure 38
Figure 39
183
131
152
33