10 Commissioning
This chapter describes the process of the first run of the TC500K3US-O
inverter after the installation is completed, including the inspections of the
photovoltaic array, each check each wiring end of the cable before
commissioning, commissioning requirements, preparatory work before starting
and power on, etc..
10.1 Commissioning Requirements
The installation of the device shall be checked thoroughly before
commissioning. Especially check whether the voltage of DC and AC terminals
meets the requirements, and whether the polarity and phase sequence is correct.
Check whether the connection of the system comply with the requirements of
the relevant standards. And the system is properly grounded. Grounding
resistance of decisive has a great significance for the security of the entire
system, so it must be determined whether grounding resistance meets the
requirements before the first commissioning.
Before commissioning make sure all switches of the AC side, DC side
are off.