![TBEA TC500K3US-O Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/tbea/tc500k3us-o/tc500k3us-o_installation-manual_823554039.webp)
TC500K3US-O Installation Instructions
33
need rigorous designs, please contact TBEA for confirmation.
A space of at least 915mm must be kept for the tunnel escape at the
emergency exit when the TC500K3US-O is installed indoors, and obstacles
blocking the tunnel escape shall be removed to keep the tunnel escape
unobstructed.
5.3 Requirements of the Alignment of Wires, Ventilation and
Others
5.3.1 Requirements of Cable Trenches
The wires of TC500K3US-O are led in and out below, and the cables
connecting the TC500K3US-O inverter and the outside are suggested being
aligned along the cable trenches, for easy installation and maintenance.
Concrete cable trenches shall be preset at the installation location; or steel
supports shall be installed on the ground, mounting surface shall be raised, and
cables shall be laid out at overhead places. (See the relevant design standard
specifications for details)
The cable trenches are often designed and constructed by the construction
party in accordance with the relevant standards, taking the weight and size of
the equipment into full consideration.