![TBEA TC500K3US-O Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/tbea/tc500k3us-o/tc500k3us-o_installation-manual_823554017.webp)
TC500K3US-O Installation Instructions
11
commissioning. If encountering some cases not described in the manual, please
contact TBEA Co.,Ltd..
2.2 Notes on Operation
2.2.1 Live Line Measurement
High voltage is present in the plant. Touching by accident may result in
death or personal injury due to electric shock. Prior to live line measurement, it
is imperative to wear suitable personal protective equipment and instruments
(such as wearing insulated gloves, etc.).
2.2.2 Opening the Plant
Even if all connections to the inverter have been disconnected, lethal
voltage may still be present in the capacitor of the inverter. After disconnecting
the inverter from voltage sources, wait at least 5 minutes for the capacitor of
the inverter to discharge completely before maintenance and overhaul or other
operation.