DXF-200 Getting Started Guide
Page 27
NOTE
: Use one wrench to keep the fitting on the furnace stationary while tightening the hose end to it. Do
the same for the next step.
4
Connect one end of the second coolant line to the
LN2 OUTLET
) fitting and connect the
other end to a hood or vent.
Connecting the Gas Lines
1
Connect 1/8” tubing to the
PURGE GAS INLET
. Optional: tee off this line to a flow gauge to monitor
the flow rate.
Figure 11
Gas Line connections.
2
Close the
PURGE GAS FLOW
needle valve.
3
Check all air lines and connections for leakage.
PURGE GAS tubing
PURGE GAS FLOW needle valve