English
6 Aqu@Scop HT V2
6. ACCESSORIES
7. DIMENSIONS
SEE APPENDIX
8. HANDLING
Take care to avoid any rough handling or impacts when unloading and moving the appliance. Only push or
pull the appliance by its base. Place a safety wedge between the unit base and the fork lift truck to avoid
damaging the unit’s structure and casing.
The handles present on the appliance's panels are intended for the removal/refitting of the latter and must
not be used for handling the complete appliance (too heavy to be supported by the panels).
Transit holes
Ø30mm
Wedge required along the
entire length of the unit.
²
Set of stop cocks with pressure tap
²
Set of 2 flexible pipes (length 1m)
²
Hydraulic connection kit
²
Sludge pot (decanting filter)
²
Domestic hot water tank (300l)
²
Domestic hot water plate exchanger kits for:
Wall-mounted electric tank (DHW outflow via the bottom)
Floor-mounted electric tank (DHW outflow via the top)
²
Directional valve to be linked to the:
Domestic Hot Water function.
Boiler substitution function
Swimming pool function (with temperature probe kit)
²
140 litre buffer tank
²
Anti-vibration pads (Anti-vibration mountings)
²
6kW in-line electric heater
²
Dual zone Under-floor / Radiator heating kit (modulating valve + electric control box + temperature
probe)
²
Dual zone management kit for existing valve (electric control box + temperature probe)
²
Wired programmable ambience terminal
²
Wireless programmable ambience terminal
}
Accessory recommended for an
optimal functioning
Содержание AquaScop HT V2
Страница 1: ...Air water Heat Pump Installation and maintenance manual 12 0 â 17 9kW 12 6 18 9 Aqu Scop HT V2 ...
Страница 2: ......
Страница 57: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 79: ...XXIII Aqu Scop HT V2 APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 80: ...XXIV Aqu Scop HT V2 APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 81: ......
Страница 82: ......
Страница 83: ......