English
21
Aqu@Scop HT V2
12.6. FILLING THE SYSTEM WITH WATER
Once the installation is complete and after having clean and rinsed out the circuit network, you must fill
the water circuit in accordance with current professional standards until you obtain the service pressure
which will be:
0.5 bar < P. service < 2.5 bars
.
The
Aqu@ Scop HT
is equipped with an electronic water pressure sensor. This can be viewed on the main P1
screen on the display, as well as on the Maintenance screens.
The water supply should come either from the mains network or from the
Heat Pump or from any other point on the installation.
Check that the automatic bleed valve operates correctly.
You must completely bleed the circuit of all air to ensure efficient operation.
Close the inlet water valve once the hydraulic circuit is filled correctly.
The condenser water circuit is equipped with a vortex effect electronic flow
meter. This device provides real-time readings of the installation's water flow
and reassurance that this flow is adequate before starting the unit.
The appliance is also equipped with a group of safety devices including a
valve set at 3 bars, and a manual relief valve.
Water flow can be viewed on screen P2 as well as on the Maintenance screens.
Use the water circulation pump speed selector to adjust the flow in the installation at the recommended
nominal value (Refer to the §
PHYSICAL CHARACTERISTICS
, page 7). Pressure drop of the installation
must be situated in the circulator operating range.
12.7. ELECTRONIC FLOW METER
12.8. WATER FLOW REGULATION
Содержание AquaScop HT V2
Страница 1: ...Air water Heat Pump Installation and maintenance manual 12 0 â 17 9kW 12 6 18 9 Aqu Scop HT V2 ...
Страница 2: ......
Страница 57: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 79: ...XXIII Aqu Scop HT V2 APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 80: ...XXIV Aqu Scop HT V2 APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO ...
Страница 81: ......
Страница 82: ......
Страница 83: ......