Cares during the first days of work
The planter you have acquired requires during the first days of work, the precautions further
on given.
You must pay attention closely and re- adjust (if necessary) all the bolts and nuts of the
planter until it is stable, pay special and specific attention during the first three days of work.
(If a torque wrench is available chart 2 is a reference). It is also important to check the oil
level of the gearboxes and the tension of the chains since they operate the metering
systems. At last it is important to check the pressure of the tires.
CHART 2.
Summary of the maintenance tasks to be done to the planter.
Interval
Operation
Check
Clean
Change Lubricate
First days of
work
Retightening of bolts
X
Chains
X
Oil level in gearboxes
X
Tire pressure
X
Every 10
hours
Alemites/grease zerks
X
Every 25
hours
Alemites/grease zerks 25 hr.
X
At the end of
the working
season
Seed & fertilizer hoppers
X
Complete planter
X
Alemites/grease zerks
10 & 25 hrs.
X
At the
Beginning
of the
working
season
Gearboxes
X
X
Annual alemites/grease
zerks
X
X
Tire pressure
X
chains
X
Tire pressure:
600 x 16” tires
= 30 pounds/inches
2
= 2,1 kg./cm
2
11L 15
= 35 pounds/inches
2
= 2,5 kg./cm
2
400/60-15,5
= 50 pounds/inches
2
= 3,5 Kg/ cm
2
Содержание W630
Страница 1: ...OPERATOR S MANUAL W 630...
Страница 2: ...2...
Страница 4: ...4...
Страница 6: ...6...
Страница 8: ...8...
Страница 60: ...60 This page intentionally let blank...
Страница 64: ...64 This page intentionally let blank...
Страница 66: ...66...