84
14) Has the effectiveness of the activated detection zone been
tested with the black test piece (70mm diameter)?
Yes
No
15) Does the base mark match the correctly identified detection
zone?
Yes
No
16) Is the start / restart button for resetting the
SD3-A1
positioned
according to requirements and does it work properly?
Yes
No
17) Does the
SD3-A1
work in all necessary operating modes and
during the entire motion of the machine that is causing a
hazard?
Yes
No
18) Is the motion causing the hazard stopped when electrical power
to the
SD3-A1
is disconnected and is a confirmation of the start
/ restart button necessary to reset the machine after the power
is restored?
Yes
No
19) Are all test and parameter inaccessible to unauthorized
personnel?
Yes
No
20) Is an identifying sign placed on the machine for the daily test of
the
SD3-A1
where it is clearly visible for operating personnel?
Yes
No
Содержание SD3-A1
Страница 1: ......
Страница 12: ...12...
Страница 40: ...40 Fig 5 4 5 Considering the maximum measurement distance when safeguarding an area...
Страница 60: ...60 Fig 6 2 1 Example of a zone pair changeover for an AGV on a curved route...
Страница 61: ...61 Fig 6 2 2 Example of zone pair changeover with combined with reducing speed of the AGV...
Страница 101: ...101 13 13 Dimensional drawings of the SD3 A1...
Страница 102: ...102 13 14 Dimensional drawings of the mounting system...
Страница 106: ......