50
2.1.6 Unloading
Note
Load the machine only on firm, level
ground and keep a safe distance with
the road shoulder.
Chock the machine to prevent the
machine movement during loading
process.
The ramp for loading must have enough
strength and width with an maximum
slope of 15°, be sure both side of the
ramp is at equal level so that machine
could travel safely.
In case of cold weather, fully warm up
the machine.
Unloading procedure
Switch off idle speed function, set travel speed
to low speed position, adjust engine throttle
knob to set engine speed at low speed.
Raise boom to proper height.
Align the center line of machine track with that
of ramp and travel slowly.
When machine is over the rear wheels of the
trailer, operate on the machine slowly so that
the machine could transfer to the ramp
smoothly.
When on the ramp, adjust working equipment
angle so that the angle of boom and arm is
within 90-110°. Lower the bucket to the
ground until the machine leave ramp.
Содержание SWE150F
Страница 19: ...12 18 No unauthorized access label Warning Stay clear of operation area of working device...
Страница 22: ...15 23 Gravity label 24 Hydraulic oil label 25 Greasing...
Страница 151: ...144 4 4 9 Hose...
Страница 193: ...186 5 Technical specification...
Страница 197: ...190 5 1 4 Circuit diagram...
Страница 199: ...192 5 1 6 Hydraulic diagram...
Страница 204: ...197 5 2 4 SWE210F Circuit diagram...
Страница 206: ...199 5 2 6 Hydraulic diagram...