119
Smoothing work
Note
Do not excessively use bucket to
smooth the ground.
Do not pull bucket in travel manner to
carry out smoothing operation.
Do not use bucket in swing manner to
carry out smoothing operation.
Especially in case of large size
obstacles, damages may occur to
machine.
After bucket teeth touches ground vertically,
retract it a little.
When arm is away from the outer side of
excavator, and at right angle to the ground, lift
boom and fold the arm to move the bucket
teeth in level.
When arm is near the inner side of excavator
and at right angle to the ground, lower the
boom and fold the bucket at the same time to
move the bucket teeth in level.
Loading work
The procedure of using arm and bucket to
excavate is identical with that of “backhoes
excavate work”.
Swing upper-structure while raising boom.
When the bucket is reaching the top of the
truck, stop swing operation and boom lifting.
Extend arm and bucket to dump.
After dumping, swing upper-structure, fold
arm and bucket appropriately.
Note : T
he machine is allowed to swing
90° and 180° for loading. To enhance
work efficiency, always perform loading
work in 90°swing manner if possible.
Содержание SWE150F
Страница 19: ...12 18 No unauthorized access label Warning Stay clear of operation area of working device...
Страница 22: ...15 23 Gravity label 24 Hydraulic oil label 25 Greasing...
Страница 151: ...144 4 4 9 Hose...
Страница 193: ...186 5 Technical specification...
Страница 197: ...190 5 1 4 Circuit diagram...
Страница 199: ...192 5 1 6 Hydraulic diagram...
Страница 204: ...197 5 2 4 SWE210F Circuit diagram...
Страница 206: ...199 5 2 6 Hydraulic diagram...