120
Breakout work
Note
Select matched model of breaker
according to excavator model.
Main applications of breaker
:
Crush rock
Road construction
Structure demolition
Keep the chisel pushed perpendicularly against
the impact surface when carrying out breaking
operation.
When applying impact, push chisel against the
impact surface and operate so that the chassis
rises approx. 5 cm (2 in) off the ground. Do not
let the machine come further off the ground
than this amount.
Always keep the chisel pressed against the
impact surface properly to prevent using the
impact force when there is no resistance.
Adjust bucket cylinder at all time, always keep
chisel pushed perpendicularly against the
impact surface.
When it’s difficult to break, do not apply
continuous impact to the same surface for
longer than 1 minute. Change the point of
impact and carry out breaking operation closer
to the edge.
Содержание SWE150F
Страница 19: ...12 18 No unauthorized access label Warning Stay clear of operation area of working device...
Страница 22: ...15 23 Gravity label 24 Hydraulic oil label 25 Greasing...
Страница 151: ...144 4 4 9 Hose...
Страница 193: ...186 5 Technical specification...
Страница 197: ...190 5 1 4 Circuit diagram...
Страница 199: ...192 5 1 6 Hydraulic diagram...
Страница 204: ...197 5 2 4 SWE210F Circuit diagram...
Страница 206: ...199 5 2 6 Hydraulic diagram...