Page | 69
Hybrid Inverter | Installer Manual
6. COMMISSIONING
6.1. Start-Up / Shutdown Procedure
The inverter must be installed by a qualified / licensed electrical engineer in accordance to the
countries wiring regulations.
Before switching on, the installation engineer must have completed the Earth Bond, RCD and
earth leakage tests, checked that the solar panel Voc voltage does not exceed 480V and
checked the battery voltage.
Power ON Sequence:
1. Switch on AC
2. Press Start Button
3. Switch on Battery and battery breaker
4. Switch on the DC (PV Isolator
Shutdown Sequence:
1. Switch off AC
2. Press the start button
3. Switch off the battery and the battery breaker
4. Switch off the DC (PV isolator
Содержание SUN-25K-SG01HP3-EU-BM2
Страница 19: ...Page 19 Hybrid Inverter Installer Manual 4 4 1 Function Ports Definition ...
Страница 26: ...Page 26 Hybrid Inverter Installer Manual ...
Страница 27: ...Page 27 Hybrid Inverter Installer Manual ...
Страница 29: ...Page 29 Hybrid Inverter Installer Manual 4 10 Wiring System for Inverter ...
Страница 30: ...Page 30 Hybrid Inverter Installer Manual 4 11 Wiring Diagram ...
Страница 31: ...Page 31 Hybrid Inverter Installer Manual ...
Страница 32: ...Page 32 Hybrid Inverter Installer Manual 4 12 Typical Application Diagram of Diesel Generator ...
Страница 33: ...Page 33 Hybrid Inverter Installer Manual 4 13 Three Phase Parallel Connection Diagram 01 02 03 ...
Страница 44: ...Page 44 Hybrid Inverter Installer Manual ...
Страница 68: ...Page 68 Hybrid Inverter Installer Manual 5 23 3 MODE III With Smart Load 5 23 4 MODE IV AC Couple ...