Page | 18
Hybrid Inverter | Installer Manual
4. Fasten terminal with a bolt:
5. Fasten the terminal with outer cover:
Depending on the battery type, the inverter should be capable of controlling the
batteries BMS. Therefore, you need to set the protocol of the BMS on both the bat-
tery and the inverter.
When using more than one battery, the first battery will be the master, and the other
batteries will be the slaves. Please, check the battery manufacturer specification
for proper operation.
To verify if the battery is actually communicating access the Li BMS menu as de-
tailed in section 4.13 ‘Setting Up a Lithium Battery’ and check whether the values
are realistic or not. It is important that the charge and discharge limits in that page
match the numbers expected for the number of batteries physically connected.
3. Crimp terminals:
Содержание SUN-25K-SG01HP3-EU-BM2
Страница 19: ...Page 19 Hybrid Inverter Installer Manual 4 4 1 Function Ports Definition ...
Страница 26: ...Page 26 Hybrid Inverter Installer Manual ...
Страница 27: ...Page 27 Hybrid Inverter Installer Manual ...
Страница 29: ...Page 29 Hybrid Inverter Installer Manual 4 10 Wiring System for Inverter ...
Страница 30: ...Page 30 Hybrid Inverter Installer Manual 4 11 Wiring Diagram ...
Страница 31: ...Page 31 Hybrid Inverter Installer Manual ...
Страница 32: ...Page 32 Hybrid Inverter Installer Manual 4 12 Typical Application Diagram of Diesel Generator ...
Страница 33: ...Page 33 Hybrid Inverter Installer Manual 4 13 Three Phase Parallel Connection Diagram 01 02 03 ...
Страница 44: ...Page 44 Hybrid Inverter Installer Manual ...
Страница 68: ...Page 68 Hybrid Inverter Installer Manual 5 23 3 MODE III With Smart Load 5 23 4 MODE IV AC Couple ...