Page | 28
Hybrid Inverter | Installer Manual
4.8. Earth Connection (MANDATORY)
Ground cable shall be connected to ground plate on grid side this prevents electric shock if the
original protective conductor fails.
When the inverter is in the off-grid state, the N line needs to be connected to the
earth.
In final installation,breaker certified according to IEC 60947-1 and IEC 60947-2 shall
be installed with the equipment.
4.9. WIFI Connection
For the configuration of Wi-Fi Plug, please refer to illustrations of the Wi-Fi Plug.
Содержание SUN-25K-SG01HP3-EU-BM2
Страница 19: ...Page 19 Hybrid Inverter Installer Manual 4 4 1 Function Ports Definition ...
Страница 26: ...Page 26 Hybrid Inverter Installer Manual ...
Страница 27: ...Page 27 Hybrid Inverter Installer Manual ...
Страница 29: ...Page 29 Hybrid Inverter Installer Manual 4 10 Wiring System for Inverter ...
Страница 30: ...Page 30 Hybrid Inverter Installer Manual 4 11 Wiring Diagram ...
Страница 31: ...Page 31 Hybrid Inverter Installer Manual ...
Страница 32: ...Page 32 Hybrid Inverter Installer Manual 4 12 Typical Application Diagram of Diesel Generator ...
Страница 33: ...Page 33 Hybrid Inverter Installer Manual 4 13 Three Phase Parallel Connection Diagram 01 02 03 ...
Страница 44: ...Page 44 Hybrid Inverter Installer Manual ...
Страница 68: ...Page 68 Hybrid Inverter Installer Manual 5 23 3 MODE III With Smart Load 5 23 4 MODE IV AC Couple ...