![SSS Siedle SG 650-0 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/sss-siedle/sg-650-0/sg-650-0_commissioning-instructions_1354969006.webp)
6
Overview
Commissioning sequence
Mount the Gateway, connect to the In-Home bus / IP network and switch on.
See Product Information/
System Manual
Configure the Gateway.
Optionally:
Reserve additional In-Home bus addresses.
Programming the In-Home bus
(manually or using the bus programming software).
Export the In-Home bus configuration from the bus programming software.
Import the In-Home bus configuration.
Install the software (Siedle app) on the terminals (mobile phone)
and log in at the Gateway.
Mobile network connection
Carry out a complete function test and hand over the documentation/files
to the customer.