Ranger S Installation and troubleshooting
4
connection and expansion boards.
• All programs have 12 start times per day.
• All programs can run simultaneously (to capacity of the transformer
anc connection board).
• You configure each program to run on any selection of days in a 14
day period, or on odd/even dates.
• You can activate one or more valves or programs manually while
one or more programs are running, up to a total of 12
simultaneously running valves.
• A master valve can be selected that will open when any program or
station is run.You typically assign master valve status to the valve
controlling access to municipal water or pumping station.
• Up to 10 moisture sensors that can monitor soil moisture and adjust
irrigation accordingly.
Содержание RANGER 4000 S
Страница 58: ...Ranger S Installation and troubleshooting 56...
Страница 59: ...Ranger S Installation and troubleshooting 57...
Страница 60: ...Ranger S Installation and troubleshooting 58...