Ranger S Installation and troubleshooting
53
Testing Programs
The easiest way to test whether a program is running correctly ‐ that is, it
activates the correct stations,master valves and booster pump relays ‐ is to
try to run the program manually.
Note:
All 100 station identities will activate in turn ‐ this means
that if you don't have connected stations to all slots in the
connection boards, you will experience "empty" intervals
where no stations react to the instructions.
Note:
The test will include the Master Valve but not Booster
Pumps.
Tip:
You can pause the test program just as any regular
program.
Tip:
You should enable Line Survey to be able to see the current
pulled by each station.
Содержание RANGER 4000 S
Страница 58: ...Ranger S Installation and troubleshooting 56...
Страница 59: ...Ranger S Installation and troubleshooting 57...
Страница 60: ...Ranger S Installation and troubleshooting 58...