46
The Procedure is the same for SC-2 and SC-3
1. Fill a bucket with 4 gallons (15 l) of fresh unchlorinated water, leaving at least 4” to the top
of the bucket. Mix 2 lbs. (1kg) cleaning chemical compound into the water in the bucket.
2. Perform two fresh water flushes to prepare the system for cleaning.
3. Install the service hoses from the service kit onto the service inlet and outlet quick connec-
tions and put the other end in the bucket with the cleaning chemical. Turn the yellow service
valves so they point at the service fittings
4. Confirm the pressure relief valve on the high pressure
pump is open one full turn.
5. Flip the toggle switch on the main control box to “Service”
to turn on the pump and circulate the storage chemical in the system for at least 20 minutes.
6. After 1 hour turn the service switch off. If the cleaning solution cannot be heated to 120
°F
(45°C),
then allowing the solution to soak for several hours will increase effectiveness
Clean Up:
Turn the service valves to the off position (half way)
Remove the service hoses and replace the dust caps.
Remove the filter bowls, rinse with the storage solution and reinstall with clean dry filters.
This should be a clean operation so you do not introduce bacterial into the filter bowls.
Wear clean disposable gloves if available and/or wash your hands before starting
Discard the remaining storage liquid in the bucket to a suitable drain.
Turn off the power to the system.
LEAVE THE PRESSURE RELIEF VALVE OPEN 1 FULL TURN AND LEAVE A NOTE ON
THE SYSTEM SHOWING THAT IT IS FULL OF STORAGE SOLUTION AND THE DATE.
ALSO MAKE A NOTE IN THE LOG BOOK.
Discharge/Service
Outlet
Feed/Service
Inlet
Membrane Cleaning Procedures
Содержание LB-20000
Страница 2: ...2 Page Intentionally blank...
Страница 4: ...4 Page Intentionally blank...
Страница 48: ...48 Black Parker tube fittings...
Страница 49: ...49 John Guest Super Speedfit Fittings...
Страница 64: ...64...
Страница 65: ...65...