24
11. After the purge sequence the display will alarm with
the message “Close pressure relief valve.” Remove
the tag and the rubber washer under the knob for the
valve and close it. Proceed by pressing Ok to re-
sume the last part of the Purge Cycle which will di-
rect product water to the drain.
Note: It may be necessary to adjust the Boost Pres-
sure again once the system is running at Full Speed.
Adjust the Boost Pressure according to the steps
outlined in Step 7.
12. The system will now run under pressure and
desalinate water. This mode diverts the product
water to drain in case there is any residual
chemicals in the membrane. Carefully inspect for
leaks over the entire system! Shut down the sys-
tem and repair any leaks you find.
13. After the Product Purge cycle completes, the system will prompt to Restart, then
advance to the Main Menu. If this is a NEW INSTALLATION, continue to the Cali-
bration Instructions to finalize the installation.
If you are putting the system back into service after storage or cleaning, your system is
now ready for use.
If the system is stored with Propylene Glycol, additional purging time may be re-
quired if there is a chemical odor to the product water, or if salinity remains high
after the purge sequence. All systems are shipped from the factory stored with
Propylene Glycol.
New System Start-Up and Testing continued...
Содержание LB-20000
Страница 2: ...2 Page Intentionally blank...
Страница 4: ...4 Page Intentionally blank...
Страница 48: ...48 Black Parker tube fittings...
Страница 49: ...49 John Guest Super Speedfit Fittings...
Страница 64: ...64...
Страница 65: ...65...