3-40
GY-2120WD/WS
3-3-4. Cleaning Roller and Rotary Head Cleaner Assembly
Replacement
Outline
Replacement
1.
Remove the Harness (CN851/PD-35 Board)
2.
Remove the Rotary Head Cleaner Assembly
3.
Replace the Cleaning Roller
4.
Install the Rotary Head Cleaner Assembly
5.
Adjust the Cleaning Roller Position
6.
Install the Harness (CN851/PD-35 Board)
Adjustment after Replacement
7.
Confirm the Cleaning Solenoid Operation
(SV1B: Cleaning Roller Solenoid Check) (Refer to Section 6-2. )
Note
When the cleaning roller is replaced, it is recommended to replace the CR spacer at
the same time.
.
CR spacer : 3-182-765-02
Preparation
1.
Turn the power off.
2.
Remove the upper lid. (Refer to Section 1-1-1.)
3.
Remove the plate MD. (Refer to Section 1-1-1.)
4.
Remove the cassette compartment. (Refer to Section 1-1-2.)
3-3. Drum Block
Содержание GY-2120WD
Страница 10: ......
Страница 27: ...1 17 GY 2120WD WS 1 6 Fixture and Measuring Equipment for Adjustment 1 2 3 4 5 6 7 8 9 0 18 10 d l l d d ...
Страница 224: ......
Страница 437: ...7 3 GY 2120WD WS Index Mechanical Deck Overall Block 6 7 9 8 2 1 3 4 5 ...
Страница 457: ...7 23 GY 2120WD WS Printed Circuit Board Bottom Side Block 902 902 901 PWH3 x 8 PWH3 x 8 PWH3 x 8 PWH3 x 8 PWH3 x 8 ...
Страница 469: ...8 1 GY 2120WD WS 8 1 Section 8 Block Diagrams Frame Wiring ...
Страница 476: ......
Страница 482: ......