Installation Guide
Page 47 of 53
Figure 47: PV system information
7.Step
Provide the total size of the combined
PV installed on site
Select the PV inverter connection
type
Figure 48: Power Meter setup
8.Step
Select the applicable measurement
setup depending on where the CTs
are located
Please see description for detailed
information regarding the available
measurement concepts
Figure 49: Meter configuration
9.Step
Configure the meter settings as
shown ONLY if they are not already
set
The default settings shall be as below:
o
Select EM271 as meter type
o
Select "Grid" for grid measurement
o
Select Modbus ID 4
o
Select channel 1
o
Select a second EM271 as meter
type
o
Select "Production" for PV
measurement
o
Select Modbus ID 4
o
Select channel 2
Verify the real time measurement
values are feasible