Sonnen Batterie Evo Скачать руководство пользователя страница 1

Installation Guide 
 

Page 1 of 53 

 

 

 

 

Installation manual | for authorised electricians 

sonnenBatterie Evo

 

 

 

 

 

 

 

[email protected] 

 

 

 

 

Содержание Batterie Evo

Страница 1: ...Installation Guide Page 1 of 53 Installation manual for authorised electricians sonnenBatterie Evo info sonnen com au...

Страница 2: ...ain this document for reference purposes Publisher sonnen Australia Pty Ltd Tenancy 6 Lionsgate Business Park 180 Phillip Highway Elizabeth South SA 5112 Australia Service number 61 137 666 Email info...

Страница 3: ...2 6 Handling the battery modules 10 2 7 Conduct in case of a fire 12 3 Product description 13 3 1 Technical data 13 3 2 System components 15 3 3 Symbols on the storage system 16 4 Storage and transpor...

Страница 4: ...modules 30 6 3 1 Overview sonnenModule 4 30 6 3 2 Installing the battery modules 30 6 3 3 Connecting power and BMS to the battery modules 33 6 4 Installing the power meter 35 6 4 1 Components overview...

Страница 5: ...Installation Guide Page 5 of 53 7 5 3 Multiple system operation 49 8 Maintenance 50 9 Troubleshooting 50 10 Uninstallation Disposal 52 10 1 Uninstallation 52 10 2 Disposal 52...

Страница 6: ...group of this document This document is intended for authorised and certified electricians The actions described here must only be performed by authorised and certified electricians Definition and th...

Страница 7: ...ding to potential injury if the safety information is not observed Indicates actions that may cause material damage Important information not associated with any risks to people or property Symbol Mea...

Страница 8: ...l installations must be observed at all times The storage system must only be used at a suitable installation location The transport and storage conditions must be observed The following uses are not...

Страница 9: ...rdance with the product documentation An appropriate and readily accessible disconnect device shall be incorporated in the fixed wiring All repairs on the storage system must be performed by authorise...

Страница 10: ...dust sawdust etc In direct sunlight In locations with the air ammonia content exceeds 20 ppm In presence of corrosive gases In locations with elevations above 2 000 meters above sea level In locations...

Страница 11: ...the event of mechanical damage heat or a fault This can have the following effects High heat generation on the surface of the battery cells Electrolyte may escape The escaping electrolyte may ignite a...

Страница 12: ...ipment safety gloves safety clothing face guard breathing protection are permitted to enter the room where the burning storage system is located There is a danger of electrocution when extinguishing f...

Страница 13: ...ted Battery specifications DC Nominal voltage 102 4 VDC Battery voltage range 160 230 VDC Operating voltage 204 8 VDC No of battery modules 2 Nominal capacity 11 kWh Usable capacity 90 DoD 10 kWh Max...

Страница 14: ...x 30mins 5300 VA Max backup power Max 60s 7050 VA Max backup power Max 300ms 7600 VA Maximum compatible PV inverter 6 kW Certifications Grid connections AS NZS 4777 2 2020 EMC EMI protection EN 61000...

Страница 15: ...Unit Contains the inverter and the control unit 2 Battery Module Stores energy 3 Base Contains the air filter 4 Legs Provide elevation and compensation for uneven grounds 5 Power Button System startu...

Страница 16: ...rs de energising time Warning equipment with multiple sources of supply PV generator AC mains and battery Warning product is heavy CE mark The product meets the requirements of the applicable EU direc...

Страница 17: ...ea level Fire safety regulations observed Free of dust Free of corrosive and explosive gases Free of vibrations Plain surface that can bear heavy weights Location meets local building codes 4 1 2 Stor...

Страница 18: ...r transport Hazardous material Class 9 UN number UN3480 lithium ion battery modules Weight of a battery module 40 kg 4 2 1 Transporting battery modules Improper transport of battery modules Fire outbr...

Страница 19: ...the storage system for condensation before installation Only install the storage system if there is no condensation on the surfaces If the temperature of the storage system is lower than the ambient t...

Страница 20: ...Installation Guide Page 20 of 53 2 Open all main cabinet doors 3 Leave the storage system to stand for at least 24 hours with open main cabinet doors 4 Only then can you commission the storage system...

Страница 21: ...to ensure it is complete Item Description Quantity 1 2 3 4 5 6 7 8 9 10 11 12 Main cabinet assembly Base Feet sonnenModule 4 Battery DC power cable BMS communication cable Battery rubber spacers sonn...

Страница 22: ...electrical work Working on the electrical distributor Touch voltage in the event of fault Danger to life due to electrocution Observe maximum line lengths The communication lines connected to the sto...

Страница 23: ...ects that are not part of the installation as per the illustration below Figure 4 Minimum clearances cm The minimum distances ensure that there is sufficient heat dissipation the storage system door c...

Страница 24: ...main cabinet Figure 5 Base feet assembly 1 Unpack the base screw the feet provided into the base 2 Position the base in the desired location and level it out Figure 6 Opening enclosure door 3 Unpack...

Страница 25: ...by removing the screws Figure 8 Main cabinet base assembly 5 Lift and position the cabinet on the base aligning with the four screw holes 6 Fix the cabinet to the base using the four supplied screws a...

Страница 26: ...easure the earth resistance between the main cabinet and the base 10 Once the external connections are made move the cabinet into its final position Figure 10 Replacing hood vent filter 11 Unscrew and...

Страница 27: ...ring external cables into the enclosure Grid supply Backup supply Modbus Ethernet Secure cable entry holes with appropriate cable glands to seal the entry holes in accordance with AS NZS 3000 The AC W...

Страница 28: ...hor point 6 2 Installing electrical and data connections 6 2 1 Connecting grid and essential load wiring Figure 12 Grid backup wire connection 1 Strip the L N and PE cables 8 10mm of the grid and back...

Страница 29: ...ad circuits and must therefore be adequately protected Neutral continuity The continuity of the grid and backup neutral is maintained internally at all times PE requirements Once the PE line of the gr...

Страница 30: ...he battery modules 6 3 1 Overview sonnenModule 4 Figure 14 sonnenModule 4 overview X1 and X2 ports are used to connect battery modules together for communication Power port Used for power cable connec...

Страница 31: ...ts 1 Remove the top module brackets by removing the screws on each bracket Figure 16 Installing first battery module 2 Place the first battery module at the back with connection terminals to the right...

Страница 32: ...Installation Guide Page 32 of 53 Figure 17 Installing last battery module 3 Place the second battery module in the remaining space and secure both modules using the top brackets...

Страница 33: ...nit to X1 terminal on the module at the back 2 2 Connect X2 on the module at the back 2 to X1 on the module at the front 1 3 Connect X2 on the module at the front 1 to X2 first on the power unit Figur...

Страница 34: ...e battery module at the back 2 BMS connection It is recommended to make the BMS prior to power connection DC cable connection When connecting the DC power cables it is important to make the connection...

Страница 35: ...consumption 3 Terminal for voltage reference 4 Power meter 5 Modbus terminal 6 Transformer interface for production 7 CT1 for production 8 CT2 for production 9 CT3 for production 10 Transformer interf...

Страница 36: ...e 36 of 53 6 4 2 Overview measurement methods The following diagrams show the consumption and grid measurement concepts Consumption Measurement Figure 21 Consumption measurement Grid Measurement Figur...

Страница 37: ...the voltage terminal strip pay attention to the correct sequence of the phases as shown in the figure on the left The connection to the voltage terminal strip depends on the number of phases In the ca...

Страница 38: ...connected The other two clamp on current transformers must not be connected Figure 26 Connecting the clamp on current transformers three phase left vs single phase right installation Do not confuse th...

Страница 39: ...nsformers incorrect right and correct left Connect the modbus cable into the RJ45 coupler of the patch cable Earth the modbus patch cable Modbus cable must have the same properties as the patch cable...

Страница 40: ...e measurement mode must be switched to three phase measurement Press the clips 2 on both sides of the power meter You might use a small screwdriver Remove the front cover 1 Insert the touch display 1...

Страница 41: ...it is possible to change the measuring mode Press twice until the setting 3P 2 3P appears Press for a longer period of time until the sign 1 disappears Figure 33 CnGPASS screen Figure 34 SYS screen F...

Страница 42: ...ten times The end screen appears Press once The three phase measuring mode is now activated Remove the touch display Insert the front cover into the power meter Figure 37 SYS screen after changing th...

Страница 43: ...able 4 Switch on the BESS Backup isolator adjacent to the system if available 5 Switch on the BESS using the green power button located on the left side of the enclosure Notice ON position is extended...

Страница 44: ...sonnen service 7 4 Commissioning 7 4 1 Taking photos to document installation The photo upload is obligatory for both offline commissioning and online commissioning To fully document the installation...

Страница 45: ...tterie are both connected to the same local network 7 5 2 Running the commissioning assistant Run the commissioning assistant until it is fully completed The commissioning assistant must be completed...

Страница 46: ...ller needs to enter installer accreditation number here Figure 45 Notification settings 5 Step Select the desired notification settings It is recommended to enable the system owner offline notificatio...

Страница 47: ...cription for detailed information regarding the available measurement concepts Figure 49 Meter configuration 9 Step Configure the meter settings as shown ONLY if they are not already set The default s...

Страница 48: ...ep Verify the system output and the parameters are correct and click yes or no Figure 52 Completion of commissioning 12 Step Read and follow through with the checklist Check the box confirming all the...

Страница 49: ...Installation Guide Page 49 of 53 7 5 3 Multiple system operation Testing to AS NZS 4777 2 2020 for multiple phase combinations has not been conducted...

Страница 50: ...th for the air flow Clean the filter mat located in the base using warm water Check for any loose or damaged connections wires and conduit Carefully clean the outside of the storage system with a clea...

Страница 51: ...luminates red The storage system has detected a problem that is preventing normal operation or may cause damage to the storage system Contact your installer or sonnen service team to resolve the issue...

Страница 52: ...he battery modules in their original packaging only If you no longer have the original packaging new packaging can be requested from sonnen Australia Never transport damaged battery modules Improper d...

Страница 53: ...Installation Guide Page 53 of 53 sonnen Australia Tenancy 6 Lionsgate Business Park 180 Philip Highway Elizabeth South SA 5112 Australia P N 5000580 REV 000...

Отзывы: