4 Prior to assembly
Option 3: Lifting with a crane
Fig. 2-13_002aiAB_Crane transport with Euro pallet (condition at
delivery)
Fig. 2-14_003-iAB_Crane transport with lifting aid
4.6 Attach sealing tape
►
For optimum thermal and acoustic sealing, affix
the enclosed sealing tape
1
over the underside of
the base (over the entire base circumference).
Fig. 2-15_006BG
4.7 Prepare heat pump
Dismantling the cover
►
Loosen the cylinder head screws TX25
1
and
remove the covers.
Fig. 2-16
Installation manual
vampair
13
Содержание vampair K 08
Страница 25: ...7 Electrical connection Installation manual vampair 25 7 4 Electrical connection plan...
Страница 33: ...9 Foundation plan Installation manual vampair 33 Side view of foundation Section A A Fig 2 46...
Страница 34: ...Side view of foundation Section B B Fig 2 47 Detail B Fig 2 48 9 Foundation plan 34 Installation manual vampair...