4 Prior to assembly
4 Prior to assembly
4.1 Installation site
–
Outdoor installation only
–
The ground must be seepable (due to condensate
discharge
) and local regulations and con-
ditions must be observed.
–
The heat pump is weathe6rproof and requires no
additional protective measures (roofing, ...). Excep-
tion: In the event of a risk of roof avalanches,
mechanical protection for the heat pump must be
provided, e.g. protective roof).
–
The air flow through the evaporator must not be
impaired on the air intake and exhaust side (e.g. by
shrubs, walls,...).
–
Do not install the heat pump with the air outlet side
against the main wind direction. Preferred instal-
lation is on a wall, with minimum distance, see
foundation plan
–
Take noise development into consideration (do not
place in front of the bedroom window, next to the
terrace, near neighbours ...).
–
Ensure free accessibility (e.g. for service work).
–
Installation in a sink is not permitted (lack of air
exchange due to sinking, cold air).
–
The sucked air must not be contain ammonia. The
use of exhaust air from animal stables is therefore
not permitted.
–
When using heat pumps near the sea, the high salt
content of the air can lead to increased corrosion
(invalidation of warranty if ignored). The use of heat
pumps is harmless from a distance of 12 km to the
sea.
4.2 Concrete foundation
–
Surface: Place the heat pump on a solid, horizontal
surface with sufficient load-bearing capacity, pre-
ferably on a concrete foundation. Provide a feed-
through for hoses and cables in the foundation.
–
Place the heat pump directly on the concrete foun-
dation. To avoid the transmission of vibration, the
entire heat pump unit (including compressor) is
mounted on rubber buffers. Screwing the heat
pump to the concrete foundation is not required.
–
Lay the heat pump pipe (with heating supply and
return pipe) at frost-free depth, lay the outlet of the
condensate drain hose to frost-free depth.
–
Insulate the concrete foundation with moisture-resi-
stant XPS panels (do not use EPS panels).
–
Alternative: For easy preparation of the concrete
foundation see article
Insulating stone for foun-
dation
(item no. 25350). This XPS-shaped block
allows fast, comfortable formation of the foun-
dation, including the precise placement of the heat
pump tube.
4.3 Observe heat pump pipe connection
Fig. 2-9_002-iAX
see foundation plan
see supply lines, electrical connection
Installation manual
vampair
11
Содержание vampair K 08
Страница 25: ...7 Electrical connection Installation manual vampair 25 7 4 Electrical connection plan...
Страница 33: ...9 Foundation plan Installation manual vampair 33 Side view of foundation Section A A Fig 2 46...
Страница 34: ...Side view of foundation Section B B Fig 2 47 Detail B Fig 2 48 9 Foundation plan 34 Installation manual vampair...