4 Prior to assembly
4.4 Condensate discharge
When defrosting the evaporator, condensate accu-
mulation of up to 50 litres per 24 h is possible, even
over a longer period. This quantity of fluid must be relia-
bly discharged.
2 methods of discharging
–
Drain into the earth surface: If sufficient water-per-
meable earth layers are present, it is sufficient to
lay the drainage hose in gravel fill to a depth of 90
cm (frost-free)
!
CAUTION
- When placing the heat pump
close to the building, it must be ensured
that the condensation does not damage the
building.
–
Discharge into the sewage system: Outdoors is
possible, or to frost-free depth indoors (basement,
...) is possible. In both cases provide sufficient
slope and trap (siphon) If a part of the drainage
hose can not be laid frost-free, it must be heated by
a heating cable.
►
Connect condensate drain
4.5 Transport
Option 1: Transport with a lift truck
►
Loosen the 4 sheet metal screws (TX25)
1
and
remove both covers
2
.
►
Carefully insert the lift truck (the pipe bend for the
condensate drain is on the left side).
Fig. 2-10_001BE
Option 2: Lift/move with the lifting aid
Fig. 2-11_001BG_ Lifting aid - 4-piece
►
Mount the bracket
1
with two screws
2
on the
base of the heat pump.
The support angle
3
is adjustable by repositioning
the screws
4
to a different height.
The tab
5
is used for attaching a hoist, e.g. for
transport by crane.
Fig. 2-12_002BG_Lifting aid
12
Installation manual
vampair
Содержание vampair K 08
Страница 25: ...7 Electrical connection Installation manual vampair 25 7 4 Electrical connection plan...
Страница 33: ...9 Foundation plan Installation manual vampair 33 Side view of foundation Section A A Fig 2 46...
Страница 34: ...Side view of foundation Section B B Fig 2 47 Detail B Fig 2 48 9 Foundation plan 34 Installation manual vampair...