- 8 -
- 8 -
2.3 LOADING AND UNLOADING INSTRUCTIONS
THESE OPERATIONS SHOULD BE PERFORMED
ONLY BY QUALIFIED AND EXPERIENCED PER-
SONNEL.
LOADING AND UNLOADING THE MACHINE MUST
BE PERFORMED, IF POSSIBLE, USING A BRIDGE
CRANE.
WHEN THE PLANTER IS DELIVERED, IT SHOULD
BE IMMEDIATELY CHECKED TO DETECT POSSI-
BLE DAMAGES DURING TRANSPORTATION OR
MISSING PIECES. ONLY THE IMMEDIATE REPOR-
TING OF THIS TO THE DELIVERER WILL RESULT
IN COMPENSATION.
WARNING:
SEE SECTION 3.2, TECHNICAL
CHARACTERISTICS, FOR KNOWING THE LOAD
THAT THE BRIDGE CRANE SHALL SUPPORT
The images show the towrope arrangements and mooring
points for this operation:
- Front:
A towrope located at the internal front part of the
hopper (Fig. 2.2).
- Rear:
two towropes located at the sowing equipment
sub-chassis (Fig. 2.3).
Fig. 2.3
Fig. 2.2
Fig. 2.1