SUNSYS HES L - 551697A - SOCOMEC
30
EN
- Remove the roof and replace the 4 screws by M12 lifting rings, we recommend you to use double swivel rings
(not supplied):
60°
60°
Torque 20Nm
/ 14.75 ft lbs
Figure 22. Lifting lugs on top of the C-Cab
- Should you not use double swivel rings but basic ones; you will need to use a vertical load spreader, not supplied
(as illustrated below) for handling.
Figure 23. Vertical load spreader
CAUTION!
While lifting it is important to ensure that even vertical load, distribution on all the lifting eyes and slowly lift and
move into a prepared location while observing standard safety protocols. Do not use slings or straps without
spreaders to lift the units from above.
No tilting is permitted. The unit cannot be laid.
Содержание SUNSYS HES L
Страница 1: ...SUNSYS HES L USER MANUAL Energy Storage System EN UL...
Страница 5: ...SUNSYS HES L 551697A SOCOMEC 5 EN...
Страница 15: ...SUNSYS HES L 551697A SOCOMEC 15 EN CHILLER SWITCHES BATTERY MODULES Figure 02 SUNSYS B Cab L composition...
Страница 114: ...551697A CORPORATE HQ CONTACT SOCOMEC SAS 1 4 RUE DE WESTHOUSE 67235 BENFELD FRANCE www socomec com...