SUNSYS HES L - 551697A - SOCOMEC
31
EN
5. PREPARATION
5.1. Civil and foundation requirements
SUNSYS HES L must be installed on a concrete pad that must:
• be of a suitable size, minimum:
- 150mm deep – for SDS (Numeric seismic design value 0.2s) 1.5g;
- 203mm deep – for SDS 2.5g;
- 508mm around the equipment.
•
be free from conductive, inflammable and corrosive items;
• support the weight of the units and guarantee their stability, it shall be of a minimum capacity of 3000psi or 20.68MPa,
• respect a solid and perfectly levelled ground, in order to ensure the correct drainage of the water and avoid its stagnation
•
respect the flatness / unevenness values in respect to DIN 18202: table 3, line 4.
For more info, you can have a look at the Anchorage report provided in Annex.
To carry out the foundation calculations, it is necessary to take into account the loads that influence the ambient conditions,
as per the country regulations.
The floor must be a non-combustible surface as required by UL1741 chapter 5.8.2.
Dimensions
in
/mm
8
203.2
Figure 24. Concrete depth – SDS 2.5
Содержание SUNSYS HES L
Страница 1: ...SUNSYS HES L USER MANUAL Energy Storage System EN UL...
Страница 5: ...SUNSYS HES L 551697A SOCOMEC 5 EN...
Страница 15: ...SUNSYS HES L 551697A SOCOMEC 15 EN CHILLER SWITCHES BATTERY MODULES Figure 02 SUNSYS B Cab L composition...
Страница 114: ...551697A CORPORATE HQ CONTACT SOCOMEC SAS 1 4 RUE DE WESTHOUSE 67235 BENFELD FRANCE www socomec com...