IT
ALIANO
ENGLISH
30
IOMMASGPXX00-GB_01
Green Power
100-120 kVA
UNPACKING AND INSTALLATION
4
4.9.2-1
20 m max
25 m max
ON INVERTER
UPS
Eco
1025kVA
10:30
?
ON INVERTER
UPS
Eco
1025kVA
10:30
?
ON INVERTER
UPS
Eco
1025kVA
10:30
?
Legend.
A
Single UPS magneto-thermal
switch.
B
“Parallel bus” cable.
C
Coupling cabinet magneto-
thermal switch. The value
must be 250 A x number of
UPSs connected in parallel.
D
System shutdown switch.
E
Distribution.
F
Cable core size: 70 mm
2
x
number of UPSs connected in
parallel.
G
Coupling cabinet.
H
Manual by-pass auxiliary
switch.
A
A
A
C
B
B
B
D
E
F
F
G
4.9.2 Recommended N+1 parallel confi guration.
MAINS
AUX MAINS
up to 6
UPSs
LEFT
INTERNAL
RIGHT
H
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...