ENGLISH
IOMMASGPXX00-GB_01
15
Green Power
100-120 kVA
4
UNPACKING AND INSTALLATION
4.1 UNPACKING PROCEDURE.
4.1-3
4.1-1
WARNING!
Refer to paragraph 4.2 if the equipment has to be moved from
above.
All packaging material must be recycled in compliance
with the laws in force in the country where the system is in-
stalled.
4.1-2
4.1-4
1
2
Place the UPS in the installation
area.
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...