ENGLISH
IOMMASGPXX00-GB_01
19
Green Power
100-120 kVA
4
UNPACKING AND INSTALLATION
4.4 INSTALLATION PROCEDURES AND INSTRUCTIONS.
WARNING!
Before carrying out work on the terminal board or on UPS internal parts, ensure that the UPS is
switched off , remove the power supply, open the external battery cabinet disconnectors, isolate
the system and wait 5 minutes.
The connecting bars are made of aluminium!
Use only aluminium cables or cables with tinned eyelets for the connections.
4.4.1 Connections if the MAINS and AUX MAINS are connected IN COMMON.
4.4-1
4.4-2
4.4-3
OPEN
OPEN
4.4.2 Connections if the MAINS and AUX MAINS are connected SEPARATELY.
MAINS
MAINS
OUTPUT
OUTPUT
4.4.1-1
4.4.2-2
AUX MAINS
AUX MAINS
MAINS
MAINS
OUTPUT
OUTPUT
4.4.2-1
N
N L1
L1 L2
L2 L3
L3
N
N L1
L1 L2
L2 L3
L3
N
N L1
L1 L2
L2 L3
L3
N
N L1
L1 L2
L2 L3
L3
N
N L1
L1 L2
L2 L3
L3
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...