ENGLISH
IOMMASGPXX00-GB_01
11
Green Power
100-120 kVA
3
REQUISITES
3.2.1 Installation on raised fl ooring.
If the UPS is to be installed on raised fl ooring, the SOCOMEC UPS adjust-
able frame (fi gure 3.2.1-1) must be used to support the weight of the unit
(fi gure 3.2.1-2).
Refer to the relevant installation manual provided in the
packaging for information on frame assembly operations.
Allow for small openings in the fl oor panels to ensure the air fl ow at the
front (fi gure 3.2.1-3).
3.2.1-1
3.2.1-2
3.2.1-3
3.2.2 Installation over a tunnel.
3.2.2-1
MASTERYS
Green Power
COOL
AIR
COOL
AIR
DOOR
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...