IT
ALIANO
ENGLISH
12
IOMMASGPXX00-GB_01
Green Power
100-120 kVA
REQUISITES
3
3.3-1
Correct installation.
3.3 GENERAL RULES FOR CABLE INSTALLATION ON TRAY.
WARNING!
The cables must be in installed on trays when indicated in the following diagrams. The trays must
be positioned near to the UPS.
WARNING!
All metal and suspended ducts or those in raised fl ooring MUST be connected to earth and to the
various cabinets.
WARNING!
Power cables and control cables MUST NEVER be installed in the same duct.
3.3-2
WARNING!
Risk of electromagnetic interference between battery
cables and output cables.
Common
Mains
Load
N
N
Battery
Control
cables
1
Mains
Aux Mains
N
N
Battery
Load
N
Control
cables
1
Common
Mains
Load
N
N
Battery
≥10 cm
≥10 cm
Control
cables
1
≥10 cm
Mains
Aux Mains
N
N
Battery
Load
N
≥10 cm
≥10 cm
≥10 cm
≥10 cm
Control
cables
1
Allowed installation.
1
Control cables: connections between the cabinets and each unit, alarm signals,
remote mimic panel, connection to the BMS (Building Management System),
emergency stop, connection to generator.
3.3-1
Wrong installation.
N
N
N
N
N
WARNING!
Do not expose power cables to other equi-
pments sensitive to the electromagnetic
fi eld.
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...