IT
ALIANO
ENGLISH
10
IOMMASGPXX00-GB_01
Green Power
100-120 kVA
3.2-2
3.2-4
Ventilation.
3.2-5
3.2-3
• Several cabinets can be installed adjacent to each other (figure 3.2-2).
• Two Masterys Green Power 100-120 can be installed back to back (figure 3.2-3).
• Observe the direction of the ventilation flows (figure 3.2-4) and heat dispersion flows (figure 3.2-5). See chapter 11
for the technical specifications relating to the required ventilation values.
≥ 10 cm
(between the backs)
3
REQUISITES
COOL
AIR
WARM
AIR
Climate control.
CLIM
ATE C
ONTROL
COOL
AIR
WARM
AIR
MASTERYS
Green Power
BATTERY
CABINET
BATTERY
CABINET
MASTERYS
Green Power
MASTERYS
Green Power
MASTERYS
Green Power
MASTERYS
Green Power
MASTERYS
Green Power
CLIMATE CONTROL
MASTERYS
Green Power
Содержание Green Power 100
Страница 1: ...INSTALLATION AND OPERATING MANUAL Green Power 100 120 kVA ...
Страница 2: ......
Страница 42: ...ITALIANO ENGLISH 42 IOMMASGPXX00 GB_01 Green Power 100 120 kVA MIMIC PANEL 6 6 4 1 6 6 4 1 8 6 4 1 7 6 4 1 9 ...
Страница 64: ...FRANÇAIS ...