-
6
-
Introduction
It is recommended that the operator read the operation manual for LECSA prior to use. For the handling and
details of other equipment, please refer to the operation manual for said equipment.
Check that the main circuit power supply (AC100V/AC200V) and controller circuit power supply (24V) are wired
correctly. Please refer to chapter
3.1 of the “LECSA Operation Manual” and chapter 2 of the “LECSA Operation
Manual (Simplified Edition)
” for details.
When setup software (MR Configurator2
TM
) is used, the LECSA model selection is required.
Select 'MR-JN-A
' through “Model" - "New" and "Project".
Terms
Position control mode (pulse)
Control the motor rotation speed and direction with pulse train and perform
positioning.
Positioning mode (Point table)
Set the positioning data, rotation speed, Acceleration/Deceleration time
constant of the drivers point table and execute ON/OFF control of the
positioning operation using the I/O signals (a maximum of 7 points can be
used for the point table configuration).
1. Configuration
Minimum equipment and wiring requirements to get started
1
Driver
LECSA*-S*
2
Motor cable
LE-CSM-***
3
Encoder cable
LE-CSE-***
4
I/O connector
LE-CSNA
I/O cable
LEC-CSNA-1
5
USB cable
LEC-MR-J3USB
6
Setup software (MR Configurator2
TM
)
LEC-MRC2*
7
Main circuit power supply connector
CNP1 (Accessory)
8
Control circuit power supply connector
CNP2 (Accessory)
Note) The lock cable option is not shown on this drawing. Refer to the
“LECSA Operation Manual” for details.
8
3
4
6
2
1
7
Electric Actuators
Ex) LEF
PC
Provided by customer
24 VDC
Provided by customer
100V AC /200 V AC
Provided by customer
Provided by customer