HRX-OM-R026
Chapter 3 Transport and Setting Up
HRSH Series
3.3
Installation
3-13
In case of option B, option S and HRSH090-
-40-
Breaker
’s operating characteristic
Be sure to lock out and tag out the breaker of the facility power supply
(customer power supply facility) before wiring.
Be sure to connect the power supply cable from the product side first,
and then connect the breaker of the facility power supply (the user’s
machine power supply).
When the panel is removed or mouted, be sure to wear protective
shoes and gloves to prevent injury with the edge of the panel.
A breaker that has the operating characteristic below is installed. Please use a
breaker that has the same or longer operating time as/than this for the customer
side (primary side). If it is a shorter operating time, there is a possibility of
accidental breaker trip due to the internal motors
’ inrush currents of this product.
4h
2h
1h
30min
20min
14min
10min
6min
4min
2min
1min
30s
20s
10s
5s
2s
1s
0.5s
0.2s
0.1s
0.05s
0.02s
0.01s
100
135
200
300
400 500 600700
1000
1500 2000
3000 4000
Current (% for breaker capacity)
Op
e
ra
tin
g
tim
e
Min.
Max.
Содержание HRSH090 Series
Страница 8: ...HRX OM R026 Contents HRSH Series...
Страница 20: ...HRX OM R026 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRSH Series 2 6...
Страница 52: ......
Страница 62: ......
Страница 126: ...HRX OM R026 Chapter 5 Display and setting of various functions 5 20 Alarm customizing function HRSH Series 5 64...
Страница 148: ......
Страница 172: ...HRX OM R026 Chapter 8 Control Inspection and Cleaning 8 4 Stop for a Long Time HRSH Series 8 10...
Страница 177: ...HRX OM R026 Chapter 9 Documents HRSH Series 9 1 Specifications 9 5...
Страница 193: ......