HRX-OM-R026
Chapter 3 Transport and Setting Up
3.3
Installation
HRSH Series
3-10
3.
Set hexagon screws to the anchor bolts and screw the holding screws into the product to
settle the product to the floor. Fixture is mounted to the front and the rear surface of the
product. (2 places)
【
Tips
】
SMC Foundations bolt set [IDF-AB500] (SUS M10x50mm) is applicable.
Fig. 3-7
Settlement to the floor
Содержание HRSH090 Series
Страница 8: ...HRX OM R026 Contents HRSH Series...
Страница 20: ...HRX OM R026 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRSH Series 2 6...
Страница 52: ......
Страница 62: ......
Страница 126: ...HRX OM R026 Chapter 5 Display and setting of various functions 5 20 Alarm customizing function HRSH Series 5 64...
Страница 148: ......
Страница 172: ...HRX OM R026 Chapter 8 Control Inspection and Cleaning 8 4 Stop for a Long Time HRSH Series 8 10...
Страница 177: ...HRX OM R026 Chapter 9 Documents HRSH Series 9 1 Specifications 9 5...
Страница 193: ......