HRX-OM-R026
Chapter 8 Control, Inspection and Cleaning
HRSH Series
8.4
Stop for a Long Time
8-9
8.4.2
Drain of the facility water
1.
Shut off the breaker of the customer
’s power supply.
2.
Stop supplying the facility water and make sure there is no pressure in the facility water
piping.
3.
Remove the facility water piping from the product.
4.
Open the Left side panel then, open the air vent valve. The facility water in the product
will be drained from the facility water inlet port.
Fig. 8-6 Discharge of the facility water
5.
After draining, shut the air vent valve and close the Left side panel.
Stop the customer device and release the residual pressure before
draining the facility water.
For relocation or long-term storage, drain the residual liquid in the piping as
much as possible. Residual liquid may drip during movement or installation.
Facility water inlet
A view
A
Air vent valve
Facility water outlet
Содержание HRSH090 Series
Страница 8: ...HRX OM R026 Contents HRSH Series...
Страница 20: ...HRX OM R026 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRSH Series 2 6...
Страница 52: ......
Страница 62: ......
Страница 126: ...HRX OM R026 Chapter 5 Display and setting of various functions 5 20 Alarm customizing function HRSH Series 5 64...
Страница 148: ......
Страница 172: ...HRX OM R026 Chapter 8 Control Inspection and Cleaning 8 4 Stop for a Long Time HRSH Series 8 10...
Страница 177: ...HRX OM R026 Chapter 9 Documents HRSH Series 9 1 Specifications 9 5...
Страница 193: ......