CONNECTION TO THE SUNNy TRIPOWER STORAGE 60
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
7 Connection to the Sunny Tripower Storage 60
ATTENTION! Possible damage to the STORAGE-67-TS-10 and/or the STPS 60-10 by additional
consumers in the DC intermediate circuit.
Always follow the specifications for connecting the STORAGE-67-TS-10 and the STPS 60-10. For example, no
additional consumers or components may be included in the DC intermediate circuit between the battery and
inverter. you must always consult the SMA Service center about any changes you would like to make to the sys-
tem setup.
NOTE
Up to 20 STPS 60-10s can be operated in parallel per SMA Inverter Manager.
7.1 System setup
Standard system setup
www
ennexOS
Portal
TS HV 70 storage system
Max. 4 x TS HV 70
per SMA STPS 60
BatBreaker SMA STPS 60
SMA STPS 60
Utility grid
Consumer
Power measurement
(Janitza UMG 604)
Diesel
PV
Wind
Inverter
Inverter
Max. 20 x
SMA STPS 60
per Inverter Manager
Energy transfer
Communication
Router
SCADA
Remote
monitoring
SMA
Inverter Manager
LAN 2
Switch
LAN 1
Switch
LCS tool
SMA Data
Manager
System setup with SMA Hybrid Controller
www
LAN 1
Switch
LAN 2
Switch
ennexOS
Portal
TS HV 70 storage system
Max. 4 x TS HV 70
per SMA STPS 60
BatBreaker SMA STPS 60
SMA STPS 60
SMA
Inverter Manager
Utility grid
Consumer
Power measurement
(Janitza UMG 604)
Diesel
PV
Wind
Inverter
Inverter
Max. 20 x
SMA STPS 60
per Inverter Manager
Energy transfer
Communication
Router
SCADA
Remote
monitoring
LCS tool
SMA Data
Manager M