INSTALLATION
25
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
19
Connect the BAT COM communication cable using the patch cables
5 .2
and
4 .3
provided. Using a patch cable
4 .3
, connect the con-
nection points of the SMA HV APU [BAT COM
11
] with the BAT COM
“IN” of the battery module placed under the SMA HV APU. you can
then use a patch cable
5 .2
to connect the BAT COM “OUT” connec-
tion of the same module to the BAT COM “IN” connection of the next
module.
20
Connect the remaining battery modules in the left half of the cabinet in the same way using the patch cables
5 .2
.
21
Establish the connection between the lowermost battery modules using
the longer patch cable
6 .2
.
22
Next, connect the remaining modules in the right half of the cabinet
using the patch cables
5 .2
, starting from the bottom. The BAT COM
“OUT” connector of the last battery module remains open.
23
Now, lay the DC cables
7 .1
and
7 .2
from the SMA HV APU to the
STPS 60-10 (CHARGER
12
13
) and to the BatBreaker. Note that the
cable can only be shortened on the STPS 60-10 or BatBreaker side.
Finally, to fix and relieve strain on the DC cables, attach two cable
clamps
11 .5
above the CHARGER connectors of the SMA HV APU to
the C-rail
1 .3
.
24
The STPS 60-10 must be fully connected before you connect the bat-
tery inverter to the SMA HV APU. The cable with the red plug
7 .1
is for
connection to the positive pole and the cable with the black plug
7 .2
is for connection to the negative pole.
The plugs must audibly click into place.